Voice Cyprus News
FeaturedWorld

Europe’s largest nuclear reactor enters service in Finland


 

Hours after Germany closed out its atomic era by turning off its last three nuclear reactors, the largest single reactor in Europe entered regular production in Finland, its operator said Sunday.
The next-generation Olkiluoto 3, now producing around 14 percent of the country’s electricity, is expected to remain operational for “at least the next 60 years”, according to the site’s operator TVO.
Germany meanwhile officially ended decades of nuclear energy use by turning off its last three nuclear reactors on Saturday.
The Isar 2 reactor in the southeast of the country, the Neckarwestheim facility in the southwest and Emsland in the northwest were disconnected from the electricity network before midnight.
Europe’s largest economy had been looking to leave behind nuclear power since 2002, but the phase-out was accelerated by former chancellor Angela Merkel in 2011 after the meltdown at the Fukushima nuclear plant in Japan.
In Finland, the European pressurised water reactor (EPR) was meanwhile put into regular service some 18 years after construction on the reactor began, and 14 years after it was originally scheduled to go into commercial production.

After it first reached full power in September last year, it was supposed to enter commercial production in December, but the start was pushed back several times during its testing phase.
– ‘Trump card’ –
Built by the French-led Areva-Siemens consortium, the reactor was first started up in December 2021 and connected to the Finnish power grid in March last year.
“Test production has been completed and regular electricity production started today,” TVO said. “From now on, about 30 percent of Finnish electricity is produced in Olkiluoto,” which already had two reactors.
With a capacity of generating 1,600 megawatts, Olkiluoto 3 is the single largest nuclear reactor in Europe, while Ukraine’s Zaporizhzhia plant, with its six reactors, is the largest nuclear plant.
Finland had been hoping to rely on the new reactor for its electricity needs earlier this winter, given fears of energy shortages after Russia, a major supplier to Europe, invaded Ukraine and cut off gas exports in response to Western sanctions.
Jarmo Tanhua, CEO of TVO, in a statement called the “environmentally friendly electricity production” one of Finland’s “top trump cards”.
– Safety vs climate –
The EPR was designed to relaunch the European nuclear industry after the Chernobyl catastrophe of 1986, and was touted as offering higher power and better safety.
But several EPR projects have been plagued by delays and billions of dollars in cost overruns.
At the end of last year, France’s state-owned energy group EDF had to announce another six-month delay for a new reactor being built at Flamanville, in northwest France, pushing back its projected start to mid-2024.
( Source AFP)

Related Posts
South Cyprus Night-Pharmacies (5th July 2024)

Overnight Pharmacies on Friday, July 5th, 2024 NICOSIA Christoforou-Papaprodromou Vera Ifigenias 59, Acropoli 22210303 22491165 Gianni Alexandra 3 Archancelou avenue Read more

North Cyprus Night-Pharmacies (5th July 2024)

The list of pharmacies on night duty in North Cyprus is as follows; LEFKOŞA (NICOSIA) DISTRICT APAYDIN PHARMACY (0392) 227 Read more


Related posts

K-pop star dies at age of 25 in suspected suicide

Voice Cyprus News

Police investigate cause of death of man found dead in Alevkayası!

Voice Cyprus News

North Cyprus Night-Pharmacies (30th June 2024)

Voice Cyprus News

Christodoulides and EU Commission President in Beirut in bid to tackle migration

CNA

Sudden death in Bahçeli!

Voice Cyprus News

Wet weather until the weekend!

Voice Cyprus News