Voice Cyprus News
CyprusFeatured

Ercan Airport’s new terminal building and runway cost 450 million Euros


 

Ercan Airport’s new terminal building and runway will be inaugurated by Turkish President Recep Tayyip Erdogan tomorrow.
The airport’s new terminal building and runway cost 450 million Euros.
The airport project was built with the build-operate-transfer model. Minister of Public Works and Transportation, Erhan Arıklı gave information about the new terminal building.
Ercan Airport’s current annual passenger capacity is 4 million and has been designed to serve a passenger capacity of 10 million with the new terminal building and runway.
Ercan Airport’s new runway is 3,200 meters long and 45 meters wide to serve large-bodied aircraft.
The new Ercan Airport is aimed to provide the country with an annual income of approximately 30 million Euros with the build-operate-transfer model.


Related posts

Daily currency exchange rates (August 11th, 2023)

Voice Cyprus News

First refugees from Nagorno-Karabakh arrive in Armenia

AP

Met Office gives good news after hot temperatures, rainy weather expected tomorrow

Voice Cyprus News

Water levels at 33% in Cyprus’ dams

CNA

Those violating traffic rules will be discontent!

Voice Cyprus News

Night-Pharmacies (6th September 2023)

Voice Cyprus News